Oct 14, 20252 min
How we make things more sustainable together
Summary The sustainability upgrade for Kleiburg phase 1 is being implemented through a step-by-step plan that helps us make decisions together. The advantage of this is that everyone can contribute, but it does take time. Ultimately, the General Members' Meeting (ALV) will decide on the plan's content. Our goal remains the same: a comfortable, energy-efficient, and future-proof apartment building. The process and the path The sustainability of Kleiburg phase 1 is a multi-year process . It...

3
0
Sep 27, 20252 min
Our flat - protected cityscape Bijlmer Museum
Summary Kleiburg is not only a large residential building but also part of the Bijlmer Museum, a municipally protected cityscape . This means that the cultural-historical value of the apartment building and its surroundings is protected. Exterior modifications, such as facades and window frames, are only permitted if they harmonize with the original character. This may have consequences for the sustainability improvements of phase 1 : some measures require additional consultation and...

15
0
Sep 11, 20252 min
Water-side balancing of heating
What is water-side balancing? Every home in Kleiburg has a Ferroli unit. This pumps hot water through radiators and/or underfloor heating loops. Without proper balancing, water flows primarily along the shortest paths: radiators close to the unit or short underfloor loops receive too much heat, while more distant rooms are left without enough. By adjusting the water side – via control valves or thermostatic valves – the flow per radiator or loop is adjusted, so that every room receives...

8
0